PVC-U (PVC Without Plasticiser - Rigid PVC) |
Typical Machine Settings: Subject To Polymer Grade |
|
Nozzle |
Front |
Centre |
Rear |
Barrel Temperature |
175 - 195oC |
170 - 190oC |
160 - 180oC |
150 - 170oC |
Melt Temperature |
175 - 195oC |
Must be measured with a pyrometer by taking an airshot through the injection machine nozzle. |
Hot Runner Temperature |
180 - 195oC |
Mould Temperature |
20 - 40oC |
Injection Rate |
Slow |
Specific Injection Pressure |
700 - 1250 Bar (10,000 - 18,000psi) |
Screw Back Pressure |
3.5 - 7.0Bar (50 - 100psi) |
Screw Speed |
40 - 50 rpm |
Processing Features |
Structure |
Amorphous |
Specific Gravity |
1.45 |
Viscosity |
High |
Large runners must be used. |
Shear Rate Susceptibility |
High |
Large gates must be used. |
Temperature Window |
Narrow |
Needs accurate & stable control |
Residence Time |
Short |
Aim for '1-Shot' residence time |
Start-Up Precedure |
- Ensure all heaters are thoroughly baked dry - do not rely on brief ‘soft start’ systems to do this.
- Fast Heat controllers automatically and safely bakeout wet heaters - ask for details.
- Turn on water lines to stabilise tool and manifold temperatures.
- Turn on manifold control zone(s) and allow to warm up until measured value is within 10oC of setpoint.
- Now turn on tip zones and allow to settle at setpoint for 5 - 10 minutes before starting production.
- Take an airshot from the machine barrel and check that the melt temperature is correct.
- Start moulding parts on a semi-automatic cycle until suitable machine settings are established.
- Avoid lengthy delays between cycles during this setting procedure.
- Switch to automatic cycle when parts are being produced, and fine tune the machine settings
|
Shut-Down Precedure |
- DO NOT shut down with PVC in the machine barrel of hot runner system.
- Purge the barrel thoroughly with stiff HPDe or other recommend polymer.
- Now start moulding parts in the purging material until all drops are clear of PVC.
- DO NOT attempt to purge through an open mould, or melt leakage my result.
- Shut down the machine & mould when ALL of the PVC has been cleaned out.
|