Home

PEI (Poly-ether imide)

Also Known As

  • Ultem

Typical Machine Settings: Subject To Polymer Grade

Nozzle

Front

Centre

Rear

Barrel Temperature

350 - 425oC

350 - 425oC

325 - 395oC

260 - 325oC

Melt Temperature

350 - 425oC

Must be measured with a pyrometer by taking an airshot through the injection machine nozzle.

Hot Runner Temperature

355 - 425oC

Mould Temperature

65 - 175oC

Injection Rate

Fast

Specific Injection Pressure

700 - 1400 Bar (10,000 - 20,000psi)

Screw Back Pressure

3.5 - 7.0 Bar (50 - 100psi)

Screw Speed

50 - 100 rpm

Processing Features

Structure

Amorphous

Specific Gravity

1.25

Viscosity

Usually Low

Can use small runners.

Shear Rate Susceptibility

Medium

Uses small to medium gates.

Temperature Window

Medium

Needs accurate & stable control

Residence Time

Medium

Aim for short residence time

Start-Up Precedure

  • Ensure all heaters are thoroughly baked dry - do not rely on brief ‘soft start’ systems to do this.
  • Fast Heat controllers automatically and safely bakeout wet heaters - ask for details.
  • Turn on water lines to stabilise tool and manifold temperatures.
  • Turn on manifold control zone(s) and allow to warm up until measured value is within 10oC of setpoint.
  • Now turn on tip zones and allow to settle at setpoint for 5 - 10 minutes before starting production.
  • Take an airshot from the machine barrel and check that the melt temperature is correct.
  • Start moulding parts on a semi-automatic cycle until suitable machine settings are established.
  • Avoid lengthy delays between cycles during this setting procedure.
  • Switch to automatic cycle when parts are being produced, and fine tune the machine settings

Shut-Down Precedure

  • DO NOT shut down with PEI in the machine barrel of hot runner system.
  • Purge the barrel thoroughly with stiff PE-HD or other recommend polymer.
  • Now start moulding parts in the purging material until all drops are clear of PEI.
  • DO NOT attempt to purge through an open mould, or melt leakage my result.
  • Shut down the machine & mould when ALL of the PEI has been cleaned out.