ABS-FR (ABS - FLAME RETARDANT) |
Typical Machine Settings: Subject To Polymer Grade |
|
Nozzle |
Front |
Centre |
Rear |
|
230 - 260oC |
225 - 250oC |
210 - 225oC |
195 - 205oC |
Melt Temperature |
230 - 260oC |
Must be measured with a pyrometer by taking an airshot through the injection machine nozzle. |
Hot Runner Temperature |
235 - 260oC |
Mould Temperature |
50 - 95oC |
Run at upper end of range for best surface finish. |
Injection Rate |
Slow To Moderate |
Specific Injection Pressure |
700 - 1400 Bar (10,000 - 20,000psi) |
Screw Back Pressure |
3.5 Bar (50psi) |
Screw Speed |
30 - 60 rpm |
Processing Features |
Structure |
Amorphous |
Specific Gravity |
1.05 |
Viscosity |
Medium |
Shear Rate Susceptibility |
Medium |
Average gates can be used |
Temperature Window |
Medium |
Needs fairly accurate & stable control |
Residence Time |
Medium |
Aim for short residence time |
Start-Up Precedure |
- Ensure all heaters are thoroughly baked dry - do not rely on brief ‘soft start’ systems to do this.
- Fast Heat controllers automatically and safely bakeout wet heaters - ask for details.
- Turn on water lines to stabilise tool and manifold temperatures.
- Turn on manifold control zone(s) and allow to warm up until measured value is within 10oC of setpoint.
- Now turn on tip zones and allow to settle at setpoint for 5 - 10 minutes before starting production.
- Take an airshot from the machine barrel and check that the melt temperature is correct.
- Start moulding parts on a semi-automatic cycle until suitable machine settings are established.
- Avoid lengthy delays between cycles during this setting procedure.
- Switch to automatic cycle when parts are being produced, and fine tune the machine settings
|
Shut-Down Precedure |
- DO NOT shut down with ABS-FR in the machine barrel of hot runner system.
- Purge the barrel thoroughly with Polystyrene or other recommend polymer.
- Now start moulding parts in the purging material until all drops are clear of ABS-FR.
- DO NOT attempt to purge through an open mould, or melt leakage my result.
- Shut down the machine & mould when ALL of the ABS-FR has been cleaned out.
|